Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Length of Road: 6.00 km, Width: 14.60m. Bridges include: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design and drawings. Funded by Government of Bangladesh (GOB).