Detailed Engineering Design (DED), Project Management and Supervision Consultancy Services for Rehabilitation of Doshi-Pol E Khomri existing Road. Construction of 55km road: 15km 4-Lane and 40km 2-Lane, with 6 nos. prestressed girder bridges and 55 nos. RCC box culverts. Funded by Islamic Development Bank (IDB). Full design and construction supervision with quality and cost control.