Design Review, Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project (MPW/870/ABD/QCBS). Length: 43 km, Width: 7.0m with PSC Bridges of 40–50m each. Funded by Asian Development Bank (ADB). Services include design approval, quality certification, FIDIC contract administration, tolling facility supervision, and benefit monitoring and evaluation.