Design, Supervision & Monitoring of Madani Avenue Road Project (from Progoti Sarani Intersection to Balu River); Phase I: Design Phase & Phase II: Construction Supervision Phase. Length of Road: 6.18 km, Width: 21.6m & 7.30m. Funded by Government of Bangladesh (GOB). Phase I includes detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation, tender documents. Phase II: 15 months construction supervision.