Design Review and 24-month Construction Supervision of 4-Lane Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at outer periphery of AUW (Asian University for Women), Chittagong. Bridges: 425.55m PSC, 40m PSC, 5 x 30m PSC, 24m RCC. Funded by GOB.