Feasibility Study for Construction of Road from Airport Road (Shalbagan Mor) to By-Pass Connection Road (1.10 km, Width 18.28m) and Kapasia Bazar to Sucharan Mor (2.35 km, Width 24.38m). Services include traffic survey, demand forecasting, preliminary engineering design, social and environmental impact assessment and economic evaluation. Funded by GOB.