Khulna By-pass Road under Rupsa Bridge – Design and Supervision (RHD)

Survey, Investigation, Detailed Design, Pre-construction Services and Construction Supervision for Khulna By-pass Road under the Rupsa Bridge Construction Project. Services include alignment fixing, topographic survey, soil investigation, bridge design, tender documents, contractor pre-qualification, full construction supervision, payment certification, environmental and resettlement management and maintenance supervision during Defects Liability Period. Funded by GOB.

Nabinagar–Shibpur–Radhika Road (R203) Feasibility Study and Detailed Design

Feasibility Study and Detailed Design of Nabinagar-Shibpur-Radhika Road (R203) and Bridges and Culverts under Brahmanbaria Road Division. 11 bridges (15–35m) and 22 culverts. Services include traffic survey, geotechnical investigation, EIA, resettlement plan, land acquisition plan and detailed engineering design. Funded by GOB.

Design Review and Supervision Consultancy for Construction of Fayzabad-Eshkashim (Fayzabad-Beharak) Road Project, Afghanistan

Design Review, Supervision Consultancy for construction supervision of Fayzabad – Eshkashim (43 km) (Fayzabad-Beharak) Road Project (MPW/870/ABD/QCBS). Length: 43 km, Width: 7.0m with PSC Bridges of 40–50m each. Funded by Asian Development Bank (ADB). Services include design approval, quality certification, FIDIC contract administration, tolling facility supervision, and benefit monitoring and evaluation.

Khulna By-pass Road under Rupsa Bridge Construction Project – Survey, Design and Construction Supervision

Khulna By-pass Road under Rupsa Bridge Construction Project. Funded by Government of Bangladesh (GOB). Services include survey, investigation, detailed engineering design, pre-construction services (pre-qualification, bid evaluation, contract award), full time construction supervision and quality control, payment certification, progress reporting, variation orders, quality assurance, environmental & resettlement management, and maintenance supervision during Defect Liability Period.

Feasibility Study and Detailed Design of Nabinagar-Shibpur-Radhika Road and Bridges & Culverts under Brahmanbaria Road Division

Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road (21 km approx. of the R203 road) and Bridges & Culverts under Brahmanbaria Road Division. Length: 21 km, Width: 7.30m with 11 bridges (15–35m) and 22 culverts. Funded by Government of Bangladesh (GOB). Services include feasibility study, traffic survey, geotechnical investigation, EIA, resettlement plan, land acquisition, economic analysis and detailed engineering design.

Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision for Widening of Barayerhat-Heanko-Ramgarh Road (R-151 & R-152)

Providing Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction works for widening the Barayerhat-Heanko-Ramgarh Road (R-151 & R-152) under Chattogram Road Division. Length: 38.00 km widening from 5.50m to 11.30m with construction of 9 bridges and several culverts. Funded by Indian Government (Line of Credit III).

Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).