Cumilla–Brahmanbaria 4-Lane National Highway Supervision (GDP-04)
Project Implementation Consulting services (Construction Supervision, Procurement Assistance) for Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project (Package GDP-04). Funded by GOB and Indian Government (GOILOC03). Services include design review of road, culvert, bridge, flyover and underpass; BoQ and cost estimates; tendering support; resettlement surveys; environmental studies; training and technology transfer; construction supervision; and traffic management and road safety.
Sylhet–Tamabil–Jaflong Road (N2) to 4-Lane – Design Review Enhancement (AIIB)

Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet-Tamabil-Jaflong Road (N2) to a 4-Lane Highway with Service Lane on both sides. 33 bridges totalling 2,221m including three major bridges: 411.04m PC Girder, 106.68m RC Girder and 197.87m PC Girder. Funded by Asian Infrastructure Investment Bank (AIIB).
Padma Bridge – Janjira & Mawa Approach Roads Construction Supervision

Construction Supervision Consulting Services for (i) Janjira Approach Road and Bridge End Facilities, (ii) Mawa Approach Road and Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads including toll plazas, service areas and offices. Funded by GOB.
Madani Avenue to Dhaka–Sylhet Highway Feasibility Study (RAJUK)

Feasibility Study including Digital Survey, IEE and EIA for Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B and widening of Major Road 5). Roads: 3.89 km, 5.21 km and 6.15 km (six and eight lanes with service lane). Four underpasses, bridges of 200m and 1,340m. Funded by GOB.
Sylhet–Tamabil–Jaflong Road (N2) Rehabilitation – Design and Supervision (1998)

Detailed Design and Construction Supervision for upgrading and rehabilitation of 61 km National Highway (N2) between Sylhet and Jaflong via Tamabil. Rigid pavement in Sylhet town, flexible pavement for the rest, and 62 drainage structures. Full construction supervision and monitoring. Funded by GOB.
Dhaka–Sylhet Road IDA-Financed Rehabilitation
IDA-financed Rehabilitation of Dhaka-Sylhet Road covering 301 structures including 37 PC Girder Bridges, 347 Box Culverts and 2 Railway Overpasses across 6 contracts in two phases. Services include design review, tender evaluation, resettlement monitoring, supervision and technology transfer. Total project cost: approximately $170.86 million. Funded by IDA.
Sylhet Town Bypass with Link to Sylhet–Fenchuganj Road (KFAED)

Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement – Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road. Phase I: Survey, soil investigation, materials investigation, land acquisition plans, engineering design. Phase II: Full-time construction supervision with quality and cost control. Funded by Kuwait Fund for Arab Economic Development (KFAED).
Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project
Project Implementation Consulting services (Construction Supervision, Procurement Assistance) for Improvement of Cumilla (Mainamati)-Brahmanbaria (Dharkhar) National Highway as 4-Lane National Highway Project. (Package No.: GDP-04). Length: 54.00 km 4-Lane Highway. Funded by GOB & Indian Government (GOILOC03).
Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet – Tamabil – Jaflong Road (N2) to a 4-Lane Highway
Design Review and Enhancement Consultancy (DRC) Services for Improvement of Sylhet – Tamabil – Jaflong Road (N2) to a 4-Lane Highway and Construction of Service Lane on both sides. Length: 56.160 km 4-Lane Highway with 33 nos. of Bridges. Total Length of 33 nos. bridges: 2221m. Funded by Asian Infrastructure Investment Bank (AIIB).
Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).