Sylhet Town Bypass with Link to Sylhet–Fenchuganj Road (KFAED)

Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement – Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road. Phase I: Survey, soil investigation, materials investigation, land acquisition plans, engineering design. Phase II: Full-time construction supervision with quality and cost control. Funded by Kuwait Fund for Arab Economic Development (KFAED).

Rajapara–Payra Port 4-Lane Connection Road Supervision

Design Review, Supervision and Management for Construction of 4-Lane Rajapara-Payra Port Connection Road, Payra Port, Bangladesh. Supervision of RCC Road, Bridge/Culvert and related structures to PPA standards. Services include sub-soil investigation review, road and structural design review, construction supervision, project management and contract administration. Funded by GOB.

Barayerhat–Heanko–Ramgarh Road Widening – R-151 & R-152 (LoC III)

Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision for widening the Barayerhat-Heanko-Ramgarh Road (R-151 and R-152) under Chattogram Road Division. Widening from 5.50m to 11.30m with 9 new bridges and culverts. Funded by Indian Government (Line of Credit III).

AUW 4-Lane Link Road, Chittagong – Construction Supervision (CDA)

Design Review and 24-month Construction Supervision of 4-Lane Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at outer periphery of AUW (Asian University for Women), Chittagong. Bridges: 425.55m PSC, 40m PSC, 5 x 30m PSC, 24m RCC. Funded by GOB.

AUW 4-Lane Link Road, Chittagong – Detailed Design (CDA)

Detailed Engineering Design of 4-Lane Link Road from Dhaka Trunk Road to Baizid Bostami Road including Loop Road along AUW, Chittagong. Bridges: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design, BOQ and tender documents. Funded by GOB.

Madani Avenue Road – Progoti Sarani to Balu River Design and Supervision

Design, Supervision and Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River). Phase I: Detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation and tender documents. Phase II: 15-month construction supervision and quality control. Funded by GOB.

Andkoy–Aquina Road DED and Supervision – Afghanistan (IDB)

Detailed Engineering Design, Project Management and Supervision for Construction of Andkoy-Aquina Road. Phase I: Survey, investigation, detailed design and tender documents. Phase II: Full-time supervision with quality and cost control. PSC Bridges of 40 to 50m each. Funded by Islamic Development Bank (IDB).

Doshi–Pol E Khomri Road Rehabilitation – Afghanistan (IDB)

DED, Project Management and Supervision for Rehabilitation of Doshi-Pol E Khomri Road. 55 km: 15 km 4-lane and 40 km 2-lane, with 6 prestressed girder bridges and 55 RCC box culverts. Phase I: Design; Phase II: Full-time supervision. Funded by IDB.