NW Road Rehabilitation and Maintenance Project – Package 1 & 2 (RRMP/IDA)

Road Rehabilitation and Maintenance Project (NW) Package 1 and 2. Services include design and supervision of construction works, maintenance, preparation of drawings and contract documents, day-to-day supervision, quality control, payment certification, progress reporting, and technology transfer and training for RHD personnel. Funded by IDA and GOB.

Dhaka–Sylhet Road IDA-Financed Rehabilitation

IDA-financed Rehabilitation of Dhaka-Sylhet Road covering 301 structures including 37 PC Girder Bridges, 347 Box Culverts and 2 Railway Overpasses across 6 contracts in two phases. Services include design review, tender evaluation, resettlement monitoring, supervision and technology transfer. Total project cost: approximately $170.86 million. Funded by IDA.

Design Review, Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connection Road

Design Review, Supervision and Management Consultant for Construction of 4-Lane Rajapara-Payra Port Connection Road, Payra Port, Bangladesh. Length: 5.01 km, Width: 4 Lanes. Funded by Government of Bangladesh (GOB). The work consists of construction supervision of RCC Road, Bridge/Culvert and related structures in accordance with the highest standards of the engineering profession.

Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision for Widening of Barayerhat-Heanko-Ramgarh Road (R-151 & R-152)

Providing Consultancy Services for Review of Pavement, Bridge, Culvert Design and Supervision of Construction works for widening the Barayerhat-Heanko-Ramgarh Road (R-151 & R-152) under Chattogram Road Division. Length: 38.00 km widening from 5.50m to 11.30m with construction of 9 bridges and several culverts. Funded by Indian Government (Line of Credit III).

Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at AUW – Supervision Phase

Design Review and Construction of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Loop Road at the outer periphery of AUW (Asian University for Women). Length of Road: 6.00 km, Width: 14.60m. Bridges include: 425.55m PSC, 40m PSC, 5x30m PSC, 24m RCC. Construction Supervision Phase: 24 months. Funded by Government of Bangladesh (GOB).

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along AUW – Design Phase

Strengthen of Link Road (4 Lane) from Dhaka Trunk Road to Baizid Bostami Road including Design of Loop Road along the outer Periphery of AUW’s land at Chittagong. Length of Road: 6.00 km, Width: 14.60m. Bridges include: 2x42m PSC, 12m RCC, 22m RCC, 20m RCC. Services include traffic survey and forecast, topographic survey, soil investigation, detailed design and drawings. Funded by Government of Bangladesh (GOB).

Construction Supervision Consulting Services for Janjira & Mawa Approach Roads and Service Area – Padma Multipurpose Bridge Project

Construction Supervision Consulting Services for (i) Janjira Approach Road and Selected Bridge End Facilities, (ii) Mawa Approach Road and Selected Bridge End Facilities, and (iii) Service Area-2 at Janjira end of the Padma Multipurpose Bridge Project. Approximately 13.6 km of approach roads and bridge-end facilities, including toll plazas, service areas and offices. Funded by Government of Bangladesh (GOB).