Bahaddarhat Junction Flyover – Chittagong Design and Supervision (CDA)

Consultancy Services for Detailed Architectural and Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Flyover at Bahaddarhat Junction, Chittagong. Services include preliminary study, conceptual architectural design, route selection, pre-qualification documents, survey works, geometric design, maps and drawings, structural design and full-time construction supervision. Funded by GOB.
Sylhet Town Bypass with Link to Sylhet–Fenchuganj Road (KFAED)

Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement – Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road. Phase I: Survey, soil investigation, materials investigation, land acquisition plans, engineering design. Phase II: Full-time construction supervision with quality and cost control. Funded by Kuwait Fund for Arab Economic Development (KFAED).
Feasibility Study, Detailed Digital Survey, IEE and EIA of Madani Avenue-Barabaraid to Dhaka-Sylhet Highway (Major Road 5A, 5B & 5)

Feasibility Study including Detailed Digital Survey, IEE and EIA of the proposed Project “Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram (Major Road 5A, 5B & widening of Major Road 5). Road lengths: 3.89 km, 5.21 km and 6.15 km (Six and eight lanes with service lane). Four underpasses, one bridge of 200m and another of 1340m (six lanes). Funded by Government of Bangladesh (GOB).
Design, Supervision & Monitoring of Madani Avenue Road Project (Progoti Sarani Intersection to Balu River) – Phase I & II

Design, Supervision & Monitoring of Madani Avenue Road Project (from Progoti Sarani Intersection to Balu River); Phase I: Design Phase & Phase II: Construction Supervision Phase. Length of Road: 6.18 km, Width: 21.6m & 7.30m. Funded by Government of Bangladesh (GOB). Phase I includes detailed planning, engineering design, traffic survey and forecast, topographic survey, soil investigation, tender documents. Phase II: 15 months construction supervision.
Consultancy Services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement Project

Consultancy Services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement Project. Upgrade and rehabilitate the 61 km road of National Highway (N2) between Sylhet and Jaflong via Tamabil. Includes rigid pavement in Sylhet town area, flexible pavement for the rest, and 62 nos. drainage structures. Funded by Government of Bangladesh (GOB).
Detailed Engineering Design, Project Management and Supervision Consultancy for Construction of Andkoy-Aquina Road, Afghanistan
Detailed Engineering Design (DED), Project Management and Supervision Consultancy Services for Construction of Andkoy – Aquina Road. Length: 32 km, Width: 7.00m with PSC Bridges of 40–50m each. Funded by Islamic Development Bank (IDB). Phase I: Survey, investigation, detailed design, tender documents. Phase II: Full time supervision with quality and cost control.
Detailed Engineering Design, Project Management and Supervision for Rehabilitation of Doshi-Pol E Khomri Road, Afghanistan

Detailed Engineering Design (DED), Project Management and Supervision Consultancy Services for Rehabilitation of Doshi-Pol E Khomri existing Road. Construction of 55km road: 15km 4-Lane and 40km 2-Lane, with 6 nos. prestressed girder bridges and 55 nos. RCC box culverts. Funded by Islamic Development Bank (IDB). Full design and construction supervision with quality and cost control.
Khulna By-pass Road under Rupsa Bridge Construction Project – Survey, Design and Construction Supervision

Khulna By-pass Road under Rupsa Bridge Construction Project. Funded by Government of Bangladesh (GOB). Services include survey, investigation, detailed engineering design, pre-construction services (pre-qualification, bid evaluation, contract award), full time construction supervision and quality control, payment certification, progress reporting, variation orders, quality assurance, environmental & resettlement management, and maintenance supervision during Defect Liability Period.
Consultancy Services for Detailed Design and Construction Supervision of Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road (KFAED Funded)
Consultancy Services for Detailed Design and Construction Supervision of Sylhet-Tamabil-Jaflong Road Improvement Project – Sylhet Town Bypass with Link to Sylhet-Fenchuganj Road. Funded by Kuwait Fund for Arab Economic Development (KFAED). Phase I: Detailed design including survey, soil investigation, materials investigation, land acquisition plans, engineering drawings. Phase II: Full time construction supervision with quality and cost control.
Feasibility Study and Detailed Design of Nabinagar-Shibpur-Radhika Road and Bridges & Culverts under Brahmanbaria Road Division
Feasibility Study and Detailed Design of Nabinagar – Shibpur – Radhika Road (21 km approx. of the R203 road) and Bridges & Culverts under Brahmanbaria Road Division. Length: 21 km, Width: 7.30m with 11 bridges (15–35m) and 22 culverts. Funded by Government of Bangladesh (GOB). Services include feasibility study, traffic survey, geotechnical investigation, EIA, resettlement plan, land acquisition, economic analysis and detailed engineering design.